399 hectares copper mine.
Along mumbwa-kasempa road. Road frontage
Valuation report indicates that the land is rich in the following minerals
*Gold
*Copper
With a valid license from the ministry of mines renewable in 2029.
*Mumbwa district central province.
• Mining license.
• All documents available and upto date.
The Mine is operational and able to produce over 6800 tones a month 37% percent of copper.
Price:U$D 7 000 000.